webinar register page

EMTP studies for IBR integration at Hydro-Quebec
Abstract:
Hydro-Quebec has been a pioneer in EMT simulations since 1981 has it contributed to the development of EMTP alongside with great companies and organisations such as BPA, ABB, AEP, CEA, CRIEPI, EDF, EPRI (83), Ontario Hydro, US Bureau of Reclamation and WAPA.. In 1998, the EMTP recoding project started at IREQ, the research center of Hydro-Quebec and the EMTP-RV (restructured version) was delivered. Since then, Hydro-Quebec has kept innovating and pushing the limit of EMT simulations. They were amount the first system operator requiring EMT manufacturer models to OEM as part of the interconnection process, almost 10 years ago, and the first simulating their entire transmission system in EMTP.

Many questions will be answered during this webinar:
- How EMT simulations are integrated into Hydro-Quebec work process?
- How EMT simulations can complete RMS simulations?
- What are the future challenges around offline simulations?


Speakers:
• Karine Gauthier, ing.
• Pascal Prud’homme, ing.
• Saad Omar, ing.

Apr 28, 2021 11:00 AM in Eastern Time (US and Canada)

Webinar logo
* Required information
Loading

By registering, I agree to the Privacy Statement and Terms of Service.

Register