Zoom Logo

UL325/ASTM F2200 Review - Shared screen with speaker view
Al
14:56
Good afternoon, thank you for having us.
Robert
15:46
will there be any big changes to safety coming out this year we need to be on the lookout for..
Zach Eichenberger
22:29
Robert, I don't anticipate any big changes coming this year. I am aware of some minor updates and we will keep you updated.
Al S iPad
30:43
UL 325 and ASTM is not voluntary.It is required by Section 3110 of 2015 IRC.Al Stasiulewicz Building Inspector for the City of Grand Rapids MI
Cynthia Stewart
37:13
There is a problem with new construction sites and a GC will have 5 different people work on that gate.
Cynthia Stewart
38:48
One will do wiring, one operator, one fencing, one access control. So there is a problem when a gate is a year old and it breaks. Fence folks do not know all of these regulations. There needs to be control when the gates are installed.
Cynthia Stewart
40:55
please email me this presentation to share with my group. thank you.
zmoore
42:44
Why does ASTM state fence w/ razor ribbon can be installed 8' o/a but on automatic gates, its's 9' o/a?
Asheville fence
45:38
Is there a stipulation on protrusions that if something extends past the end of the gate it is ok as long as it is 9 square inches or greater? I thought I read that at one time.
GFisher
45:44
The same applies to those just supplying the access control (Call box, keypad, card reader, etc). If it's wired to (attached) it
GFisher
45:55
is part of the "system as a whole".
Zach Eichenberger
46:13
zmoore, the standard for automatic gates is a minimum of 8' above grade for razor ribbon. If local code/AHJ requirements state 9', you should build to that standard.
RGravens
46:55
Will this training go towards continuing education hours that are needed to maintain a CAGSD certification?
Zach Eichenberger
47:49
Asheville Fence - You are correct, I believe we have a slide on this. The exclusion is there to allow locks like maglocks or solenoid locks.
Zach Eichenberger
48:40
RGravens - Yes, this class will count for 2 hours of CEU's.
Robert
49:58
Home Depot sales 2 1/4 wooden balls... we use them on every gate
vincorvaia
01:11:31
horizontal swing gate fall over is this for commercial and residential code?
collinsloan
01:13:14
https://www.ktvb.com/article/news/local/twin-falls-woman-killed-in-industrial-accident-lamb-weston/277-8ab3d925-1f01-4fa7-b621-000737387d03
Zach Eichenberger
01:13:15
vincorvaia - fall over protection for swing gates applies to commercial and residential.
collinsloan
01:13:34
Article I was just sent today!!
Al
01:13:56
very informative, thanks!
Tim kearns
01:14:33
Thanks Tim
Roy Kennedy BFT
01:26:33
If you touch it last are you liable even if you did not do the original installation in the event of an accident?
Roy Kennedy BFT
01:28:33
Great thanks
GFisher
01:30:04
^^- We MFG reps advised of this, needs to meet minimum UL325/ASTMF2200 requirements or we can not be there.
Asheville fence
01:31:59
If we run into one that is not compliant we either do not work on it or if we do diagnosis the gate we will note what needs to be done for compliance and note on our invoice that we left the gate powered off. That way if they turn the gate back on you leave the liability on someone else and not your company.
collinsloan
01:42:49
What kind of a statement is that? I’ll let you make the judgement on that?
collinsloan
01:43:08
Is the operator an entrapment point or not?
collinsloan
01:44:00
Sorry
collinsloan
01:44:46
Will gate operators include an edge that attaches to the housing?
collinsloan
01:46:34
Thanks for the clarifications.
Tim Nordstrom
01:46:55
Great questions!- we appreciate them
gonzo
01:50:20
please define "monitored" again
gonzo
01:51:39
monitored = electronic not human?
gonzo
01:52:54
got ya - thanks
GFisher
01:55:37
Curbs count.
collinsloan
01:55:47
:)
collinsloan
01:56:12
You knew I was going to call that one out too.
Al S iPad
01:57:24
Is the draw in post protection required by building code ?
collinsloan
01:57:47
Is the edge mounted on the side of the gate or the bottom on the bottom of a swing gate?
Asheville fence
02:00:19
Can you go back to that slide with the edge on the bottom of the gate?
Asheville fence
02:00:58
If you use a photo eye, non contact this does not apply.
Asheville fence
02:01:45
Read the first sentance
GFisher
02:02:02
I've seen photo eyes mounted to the moving panel, works well where edges are impractical.
Tim kearns
02:02:06
We have mounted a photo on the gate
GFisher
02:06:18
Question - Zach, How does the industry perceive Compliance -- System as a whole, or just the gates? IE - I'm contracted to work on the Access Control only, different company handles the gate/operator. Am I liable for safety if the Gate/Operator is out of compliance?
James.Brown
02:07:50
Does that mean that on a standard 4 leaf swing gate set we are required to install 8 signs?
GFisher
02:10:19
Zing.. Thanks @zach.
James.Brown
02:11:36
so the entry and exit do not have to have separate signs?
Tim Nordstrom
02:12:19
Each "set" of openings would need a sign on each side of the respective gates
Tim Nordstrom
02:12:51
Entry and Exit would each need signs
James.Brown
02:14:16
thank you
Ron Sherwinski
02:14:45
What about arms going through the vertical pickets of a moving gate
Jim Harlan
02:17:08
are these slides available?
Al S iPad
02:17:10
Thank you for the webinar.
Leon Hill
02:17:19
Thank you guys, great info!
Al S iPad
02:17:24
very I
GFisher
02:17:25
Thanks Tim & Zach!
eric
02:17:30
Thanks for the education!
Tim kearns
02:17:33
Thanks Zach
KNelson
02:17:36
Thank you
Al S iPad
02:17:37
very informative
rshort
02:17:55
Thanks For the Class
Alex N
02:17:57
thanks very much
vincorvaia
02:17:59
thank you !!
Matthew
02:17:59
Appreciate it. Thanks...
Brandon Felker
02:17:59
how do we get acknowledgment for our idea certs